14 taboos for installation of soft seal butterfly valve

date:[2023-02-03]     pk_hits:

Taboo 1: The main materials, equipment and products used in construction are lack of technical quality identification documents or product certificates that meet the current national or ministerial standards.

Consequences: The project quality is unqualified, there are potential accidents, and it cannot be delivered for use on schedule, and it must be reworked and repaired; The construction period is delayed and the labor and material input is increased.

Measures: The main materials, equipment and products used in the water supply and drainage and heating and sanitation engineering should have technical quality identification documents or product certificates that meet the current standards issued by the state or ministry; The product name, model, specification, national quality standard code, delivery date, name and location of manufacturer, and inspection certificate or code of ex-factory products shall be indicated.

Taboo 2: The soft seal butterfly valve is not subject to necessary quality inspection before installation.

Consequences: During the system operation, the soft seal butterfly valve switch is not flexible, the closing is not tight, and water (steam) leakage occurs, resulting in rework and repair, and even affecting the normal water supply (steam).

Measures: Before the installation of the soft seal butterfly valve, the pressure strength and tightness test shall be carried out. 10% of each batch (the same brand, specification and model) shall be sampled for the test, and no less than one. For closed-circuit soft seal butterfly valves installed on the main pipe to cut off, strength and tightness tests shall be carried out one by one. The strength and tightness test pressure of the soft seal butterfly valve shall comply with the provisions of Code for Acceptance of Construction Quality of Building Water Supply, Drainage and Heating Engineering (GB 50242-2002).

D71X manual wafer type soft seal butterfly valve

Taboo 3: The specification and model of installing the soft seal butterfly valve do not meet the design requirements. For example, the nominal pressure of the soft seal butterfly valve is less than the system test pressure; When the pipe diameter of the water supply branch pipe is less than or equal to 50mm, the gate valve is used; The main and riser pipes of hot water heating adopt stop valves; The suction pipe of fire pump adopts butterfly valve.

Consequence: It affects the normal opening and closing of the soft seal butterfly valve and the adjustment of resistance, pressure and other functions. Even in the system operation, the soft seal butterfly valve was damaged and forced to be repaired.

Measures: Be familiar with the application scope of various soft seal butterfly valves, and select the specifications and models of soft seal butterfly valves according to the design requirements. The nominal pressure of the soft seal butterfly valve shall meet the requirements of the system test pressure. According to the requirements of construction specifications: stop valves shall be used for water supply branch pipes with diameter less than or equal to 50mm; Gate valve shall be used when the pipe diameter is greater than 50mm. Gate valves shall be used for dry and vertical control valves of hot water heating, and butterfly valves shall not be used for suction pipes of fire water pumps.

Taboo 4: The installation method of soft seal butterfly valve is wrong. For example, the water (steam) flow direction of the stop valve or check valve is opposite to the sign, the valve rod is installed downward, the check valve installed horizontally is installed vertically, the handle of the rising stem gate valve or butterfly valve has no opening and closing space, and the valve rod of the concealed soft seal butterfly valve does not face the inspection door.

Consequences: The soft seal butterfly valve fails, the switch is difficult to repair, and the valve stem is downward, which often causes water leakage.

Measures: The installation shall be carried out in strict accordance with the installation instructions of the soft seal butterfly valve. The rising stem gate valve shall have sufficient valve stem extension opening height. The butterfly valve shall fully consider the handle rotation space. The various soft seal butterfly valve stems shall not be lower than the horizontal position, let alone downward. Concealed soft seal butterfly valve shall not only be equipped with inspection door meeting the opening and closing requirements of soft seal butterfly valve, but also the valve rod shall face the inspection door.

Taboo 5: The butterfly valve flange shall be ordinary soft seal butterfly valve flange.

Consequences: The size of the butterfly valve flange is different from that of the ordinary soft seal butterfly valve. Some flanges have small inner diameter, while the butterfly valve disc is large, which causes the soft seal butterfly valve to be damaged because it cannot be opened or hard to open.

Measures: The flange plate shall be processed according to the actual size of the butterfly valve flange.

Taboo 6: There are no reserved holes and embedded parts in the construction of building structure, or the reserved holes are too small and the embedded parts are not marked.

Consequences: During the construction of the heating and sanitation project, the building structure is chiseled, and even the stressed reinforcement is cut off, affecting the safety performance of the building.

Measures: Be familiar with the construction drawings of heating and sanitation works, actively and carefully cooperate with the construction of reserved holes and embedded parts in the building structure according to the needs of the installation of pipes and supports and hangers, and refer to the design requirements and construction specifications for details.

Taboo 7: During pipe welding, the staggered joint of the pipe is not on the same center line after the alignment, no gap is left for the alignment, the thick wall pipe is not beveled, and the width and height of the weld do not meet the requirements of the construction specification.

Consequence: The misalignment of the pipe is not at the same center line, which directly affects the welding quality and appearance quality. There is no gap in the butt joint, the thick wall pipe is not beveled, and the welding cannot meet the strength requirements when the width and height of the weld do not meet the requirements.

Measures: After welding the pipe butt joint, the pipe shall not be staggered, and the butt joint shall be on a central line. The gap shall be reserved. The thick wall pipe shall be beveled. In addition, the width and height of the weld shall be welded according to the specification requirements.

Taboo 8: The pipeline is directly buried on frozen soil and untreated loose soil, and the spacing and position of pipeline buttresses are improper, even in the form of dry bricks.

Consequence: due to the unstable support, the pipeline was damaged in the process of backfill compaction, resulting in rework and repair.

Measures: The pipeline shall not be buried on frozen soil and untreated loose soil. The spacing of buttresses shall meet the requirements of construction specifications. The buttresses shall be firm, especially at the pipeline interface, and shall not bear shear force. Brick buttress shall be built with cement mortar to ensure integrity and firmness.

Taboo 9: The expansion bolt used to fix the pipe support is of poor material, the hole diameter for installing the expansion bolt is too large, or the expansion bolt is installed on the brick wall or even the light wall.

Consequence: The pipe support is loose, and the pipe is deformed, even falling off.

Measures: The expansion bolts must be qualified products. If necessary, samples shall be taken for test and inspection. The hole diameter of the expansion bolts installed shall not be greater than the outer diameter of the expansion bolts by 2mm. The expansion bolts shall be applied to the concrete structure.

Taboo 10: The strength of the flange plate and gasket connected to the pipeline is not enough, and the connecting bolt is short or the diameter is thin. Rubber gaskets are used for heating pipes, asbestos gaskets are used for cold water pipes, and double-layer gaskets or inclined gaskets are used. Flange gaskets protrude into the pipes.

Consequence: The flange connection is not tight, even damaged, and leakage occurs. The flange gasket protrudes into the pipe, which will increase the water flow resistance.

Measures: The flange plate and gasket of the pipeline must meet the requirements of the design working pressure of the pipeline. The flange gasket of heating and hot water supply pipeline should be rubber asbestos pad; The flange gasket of water supply and drainage pipeline should be rubber gasket. The gasket of the flange shall not protrude into the pipe, and its outer circle shall reach the flange bolt hole. Bevel pad or several gaskets shall not be placed in the middle of the flange. The diameter of the bolt connecting the flange should be less than 2mm than the hole diameter of the flange plate. The length of the bolt rod protruding from the nut should be 1/2 of the nut thickness.

Taboo 11: During the hydraulic strength test and tightness test of the pipeline system, only observe the pressure value and water level change, and the leakage inspection is not enough.

Consequence: leakage occurs after the pipeline system operates, affecting the normal use.

Measures: When the pipeline system is tested according to the design requirements and construction specifications, in addition to recording the pressure value or water level change within the specified time, it is necessary to carefully check whether there is leakage.

Taboo 12: sewage, rainwater and condensate pipes shall be concealed without closed water test.

Consequence: It may cause water leakage and user losses.

Measures: The closed water test shall be inspected and accepted in strict accordance with the specifications. The concealed sewage, rainwater and condensate pipes buried underground, in the ceiling and in the pipe room shall ensure no leakage.

Taboo 13: The pipeline system is not washed carefully before completion, and the flow and speed cannot meet the requirements of pipeline flushing. Even the hydraulic strength test is used to discharge water instead of flushing.

Consequence: The water quality can not meet the operation requirements of the pipeline system, which often leads to the reduction or blockage of the pipeline section.

Measures: flush with the maximum set juice flow in the system or the water flow rate that should not be less than 3m/s. The color and transparency of the outlet water shall be consistent with that of the inlet water through visual inspection.

Taboo 14: water pressure test shall be conducted under negative temperature during winter construction.

Consequence: The pipe freezes due to the rapid freezing in the pipe during the hydraulic test.

Measures: try to carry out the hydraulic test before winter construction, and blow out the water after the pressure test, especially the water in the soft seal butterfly valve must be cleaned, otherwise the soft seal butterfly valve will freeze and crack. When the hydraulic test of the project must be carried out in winter, it should be carried out at a positive indoor temperature, and the water should be blown out after the pressure test. When the hydraulic test cannot be carried out, compressed air can be used for the test.


Wenzhou Longwan Donghai Butterfly Valve Factory

If you have any questions, suggestions and products you want to know, you can contact us at any time. Looking forward to your consultation!

Contact us

  • Phone:13123992527
  • Fax:0577-86912359
  • Tel:0577-86932698
  • Add:610-2 Airport Avenue, Longwan District, Wenzhou City

Online Message

WeChat

WeChat

huo520.com-日韩欧美国产午夜精品,欧美一区二区三区久久精品,欧美日韩性视频在线,亚洲一区二区三区四区五区中文
欧美成人猛片aaaaaaa| 欧美电影影音先锋| 一区二区三区中文免费| 欧美三级欧美一级| 美女任你摸久久| 久久久噜噜噜久噜久久综合| 99视频精品免费视频| 亚洲第一成年网| 欧美va亚洲va香蕉在线| 丁香另类激情小说| 亚洲午夜久久久久中文字幕久| 91精品蜜臀在线一区尤物| 国产成都精品91一区二区三| 亚洲综合久久久久| 亚洲精品一区二区三区四区高清| 成人黄色小视频| 午夜欧美视频在线观看| 久久久久久日产精品| 色婷婷综合久久久久中文| 秋霞电影网一区二区| 国产精品青草久久| 欧美精品丝袜久久久中文字幕| 国产自产高清不卡| 亚洲最大的成人av| 精品免费99久久| 一本一道综合狠狠老| 秋霞午夜av一区二区三区| 中文字幕一区在线观看视频| 91精品久久久久久久91蜜桃 | 亚洲综合成人网| 精品国产第一区二区三区观看体验| 成人av在线资源网站| 日本欧美在线观看| 国产精品美女久久久久久| 91精品久久久久久蜜臀| av成人免费在线观看| 蜜臀久久久99精品久久久久久| 中文字幕在线观看不卡| 欧美一级专区免费大片| 91片黄在线观看| 国内精品在线播放| 亚洲成人福利片| 国产精品久久影院| 欧美videofree性高清杂交| 在线亚洲一区观看| 成人免费看片app下载| 日本免费新一区视频| 亚洲欧美日韩国产手机在线| 精品国产电影一区二区| 欧美精品亚洲二区| 日本高清免费不卡视频| 粉嫩蜜臀av国产精品网站| 免费成人结看片| 亚洲综合在线视频| 国产精品美女久久久久久| 精品久久久久av影院| 欧美色综合久久| 91视频免费播放| 国产成人综合自拍| 久久精品国产免费| 午夜久久久久久久久| 亚洲伦在线观看| 中文字幕电影一区| 精品成人一区二区三区| 欧美一区二区视频观看视频| 欧美亚洲动漫精品| 色综合天天性综合| 成人精品一区二区三区四区| 国内久久精品视频| 久久国产福利国产秒拍| 日韩成人午夜精品| 亚洲成人在线网站| 亚洲一区二区三区四区的| 亚洲视频中文字幕| 中文字幕二三区不卡| 久久精品亚洲国产奇米99| 欧美刺激脚交jootjob| 91精品综合久久久久久| 欧美日韩一区二区三区高清| 一本色道综合亚洲| 91视频在线观看免费| 99国产欧美久久久精品| 成人小视频在线| 国产.精品.日韩.另类.中文.在线.播放 | 日本视频在线一区| 亚洲电影在线免费观看| 亚洲在线视频一区| 亚洲激情男女视频| 亚洲欧美另类久久久精品2019| 国产精品乱码妇女bbbb| 国产人成亚洲第一网站在线播放| 久久在线观看免费| www成人在线观看| 久久只精品国产| 久久影音资源网| 久久久久亚洲综合| 日本一区二区成人| 国产精品无码永久免费888| 国产欧美一区二区精品性色| 国产婷婷一区二区| 国产精品美女久久久久高潮| 亚洲欧美综合另类在线卡通| 最新日韩在线视频| 亚洲精品乱码久久久久久日本蜜臀| 亚洲精品菠萝久久久久久久| 一区二区三区四区不卡视频| 亚洲已满18点击进入久久| 亚洲一区二区偷拍精品| 香蕉久久夜色精品国产使用方法| 亚洲第四色夜色| 麻豆精品在线看| 国产在线乱码一区二区三区| 国产成人av在线影院| yourporn久久国产精品| 91免费在线视频观看| 欧美色图激情小说| 欧美福利一区二区| 精品日韩欧美一区二区| 中文字幕不卡的av| 亚洲欧美日韩国产中文在线| 亚洲国产精品久久久男人的天堂| 日韩一区欧美二区| 经典三级一区二区| 成人蜜臀av电影| 91久久精品一区二区三区| 欧美精品色综合| 亚洲精品一区二区三区福利 | 国内精品第一页| av在线这里只有精品| 欧美三级中文字| 日韩精品一区二区三区视频播放| 国产亲近乱来精品视频| 亚洲丝袜自拍清纯另类| 日韩影院免费视频| 国产精品一二三区| 91麻豆文化传媒在线观看| 欧美浪妇xxxx高跟鞋交| 亚洲精品一区在线观看| 亚洲色大成网站www久久九九| 亚洲电影一区二区| 国产一区在线观看视频| 91丨国产丨九色丨pron| 91精品黄色片免费大全| 欧美激情一二三区| 亚洲曰韩产成在线| 精品夜夜嗨av一区二区三区| av不卡一区二区三区| 717成人午夜免费福利电影| 久久久精品免费观看| 一区av在线播放| 国产乱人伦偷精品视频不卡| 色悠悠久久综合| 欧美变态tickling挠脚心| 中文字幕一区日韩精品欧美| 视频一区中文字幕| 成人综合婷婷国产精品久久免费| 欧美日韩国产小视频| 久久嫩草精品久久久精品| 一区二区激情视频| 国产福利一区二区三区| 欧美三级乱人伦电影| 欧美国产精品一区| 视频一区二区国产| 成人av午夜影院| 欧美成人激情免费网| 亚洲乱码一区二区三区在线观看| 九九视频精品免费| 色天天综合久久久久综合片| 久久久久久久综合色一本| 亚洲国产日产av| 成人激情开心网| 欧美大片拔萝卜| 亚洲韩国一区二区三区| 国产99久久精品| 日韩久久久久久| 亚洲一线二线三线视频| 岛国av在线一区| 精品国产三级电影在线观看| 亚洲综合小说图片| 福利一区福利二区| 日韩美一区二区三区| 亚洲bt欧美bt精品777| www.99精品| 2023国产精品| 日韩电影免费在线看| 在线亚洲人成电影网站色www| 国产亚洲成av人在线观看导航| 青青青爽久久午夜综合久久午夜| 91麻豆精品视频| 国产日韩综合av| 久久国产精品色| 在线播放/欧美激情| 亚洲美女电影在线| 99视频精品在线| 欧美经典一区二区| 国产一区二区福利视频| 精品日韩在线观看| 美女诱惑一区二区| 欧美一区永久视频免费观看| 亚洲精品水蜜桃|